Carrier 42NQV050M Service Manual page 83

Hide thumbs Also See for 42NQV050M:
Table of Contents

Advertisement

No.
Part name
Electric parts
1) Remove screw of earth lead attached to the
box assembly
2) Remove the lead wire cover, and remove
3) Pull out TC sensor from sensor holder of the
4) Disengage the display unit by simply pushing
5) Remove the fixing screw that secures the
Procedures
end plate of the evaporator.
connector for the fan motor and connec-
tor for the louver motor from the electric
parts box assembly.
evaporator.
at the top of the display unit.
conduit mount, electric parts box assembly,
LED assembly and remove the assembly.
<How to assemble the electric parts box>
1) Hook the top part of the electric parts box
assembly onto the claws on the back body,
and secure it using the fixing screw.
Now attach the display unit. Connect the
connectors for the fan motor and louver motor.
2) Secure the grounding wire using the fixing
screw. Insert the TC sensor into the sensor
holder.
* Be absolutely sure to loop the grounding
wire and TC sensor leads once at the
bottom.
Earth Screw
TC sensor
LED assembly
Fan motor
connector
Louver
motor
connector
Fixing screw
Fixing screw
Loof the qrunding wire
– 82 –
FILE NO. SVM-10052
Remarks
Electric art
p
box cover's screw

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents