Carrier 40VU007-0182-7G-QEE Installation And Owner's Manual page 14

Two-way cassette
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 6
Installation Procedures
Install ceiling later
1. Install the Unit block and template paper according to step 2-4.
2. Cut along external boundary line in the ceiling.
3. Fasten the unit after inspecting installation height and level.
A
gas pipe connector
B
liquid pipe connector
C1
drainage pipe connector
C2
natural drainage outlet
D
power inlet
E
suspension bolts
F
fresh air inlet
G
air supply branch pipe connector
VP25
VP20
M10 or M3/8
8

Advertisement

Table of Contents
loading

Table of Contents