Ductwork Configuration
When connecting ducts, insert a canvas duct between
the main body and the duct.
• Use non-combustible duct components.
• Install sufficient insulation to prevent condensation
forming on outlet duct flanges and outlet ducts.
The contractor is responsible for providing transitions to
accommodate difference in sizing between the unit and
the building ducts. Duct connections to collar-type
openings can be made with S-cleats or overlapping joints.
Apply caulk around each duct connection. Failure to seal
duct connections can cause air leakage and system
performance problems.
Note:
• When an air duct which carries supply air or warm air
passes through a combustible roof, a clearance of one inch
must be maintained between the outside perimeter of
ductwork and any combustible materials, per NFPA
Standard 90A
Figure.13: Duct Connection Dimensions
Table.14: Duct Connection Dimension
SA Outlet
Chassis
Code
L1
DC
17.6
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
OA Inlet
L2
L4
L5
53.8
49
16.4
Due to our policy of continuous product innovation, some specifications may change without notification.

Service Clearance

Allow service clearances as approximately indicated in
Figure 14. Refer to NEC and local for minimum
clearances around the unit and control panel.
Figure.14: Service Clearance Dimensions
ISOMETRIC VIEW
Service Access
(Sensor, Filter)
D1
Table.14: Service Clearance Dimensions
Fan &
Controller,
Motor
Cycle(HR),
Chassis
Assembly
Code
A1
A2
B1
DC
45.6
20
45.6
[Unit : inch]
D2
Min
Min
Distance
Distance
Filter
D1
B2
C
22
36
96.2
D2
50.2
20