Control functions
(cont.)
Note
Temperature profile 6 ends after 21 days.
Observe EN 1264. The report to be provided by the
heating contractor must contain the following details
regarding heat-up:
Heat-up data with respective flow temperatures
■
Max. flow temperature achieved
■
■
Operating state and outside temperature during
handover
Temperature profile 1: (EN 1264-4) code "F1:1"
50
40
30
20
10
1
5
10
Fig. 84
Temperature profile 2: (ZV parquet and flooring technology) code "F1:2"
50
40
30
20
10
1
5
10
Fig. 85
Temperature profile 3: Code "F1:3"
50
40
30
20
10
1
5
10
Fig. 86
Temperature profile 4: Code "F1:4"
50
40
30
20
10
1
5
10
Fig. 87
15
20
25
30
Days
15
20
25
30
Days
15
20
25
30
Days
15
20
25
30
Days
Various temperature profiles can be set via coding
address "F1" in the "Heating circuit" group.
The function continues after power failure or after the
control unit has been switched off. "Heating and DHW"
is started when screed drying is finished or if code
"F1:0" is set manually.
Function description
129