Reinforcing Struts And Tie-Bars - Viessmann Vitocrossal 300 Installation Instructions For Contractors

Hide thumbs Also See for Vitocrossal 300:
Table of Contents

Advertisement

Fitting the thermal insulation

Reinforcing struts and tie-bars

A
B
C
C
A
Fig. 13
1. Secure reinforcing strut
4.8 x 9.5
to upper rails
2
2. Secure 4 tie-bars
C
9.5
to the upper rails.
2
3. If necessary, release top rails
Check the distance between the reinforcing struts
and the boiler floor and ensure they are parallel.
(cont.)
C
1.
with self-tapping screw
A
.
B
with self-tapping screw 4.8 x
again and realign.
B
2.
4. Check whether the tie-bars and rails form a right
angle.
5. If necessary realign the bottom rails.
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr3b

Table of Contents