Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
•
1. Checks.................................................................................................................................
•
2. Filling the DHW cylinder on the DHW side......................................................................
•
•
3. Filling the DHW cylinder on the solar side......................................................................
•
•
4. Inspection and maintenance.............................................................................................
•
•
5. Shutting down the system.................................................................................................
•
•
6. Checking the safety valve function
•
•
7. Cleaning the inside of the DHW cylinder......................................................................... 10
•
•
8. Checking and replacing the magnesium anode (if required)......................................... 10
•
•
9. Returning the DHW cylinder to use.................................................................................. 11
•
•
10. Checking connections on the water side for tightness
•
•
11. Checking the thermal insulation of the cold water and DHW pipes
8
Page
9
9
9
9
9