Shindaiwa BP510S Operator's Manual page 13

Table of Contents

Advertisement

Available languages

Available languages

Loop handle assembly
Shoulder harness
Installation of shield
Installing nylon line cutting head
Before you start
1.
Assemble the front handle (A) and bracket (B) on the shaft
tube (C) loosely.
2.
Adjust the location of the front handle to a convenient posi-
tion.
3.
Tighten the screws (M5×35) (D) and nuts (E) securely. - One
of the 4 screws must be tighten together with the hanger (F)
as illustrated.
1.
Suit the length of knapsack band to comfort.
2.
As the strap is elastic and adjustable, it is preferable to con-
nect the strap (A) to the hangers (B) located on the front han-
dle (C) and the left or right knapsack band to maintain a
fatigueless and comfortable operation.
1.
Fit shield (A) to mounting portion of angle transmission and
tighten 4 bolts (B).
1.
Insert locking tool (A) into a hole located on the right side of
angle transmission while forcing retainer spring to the left
side.
2.
Insert locking tool further into blade retainer fixing slot (B) to
fix output shaft.
3.
Using the socket wrench, remove the nut (C), cup (D), and
lower blade retainer (E).
Nut, cup, and lower blade retainer are not used with a nylon
line cutting head.
11

Advertisement

Table of Contents
loading

Table of Contents