Siting Requirements - Viessmann Vitocal 350-G Installation And Service Instructions For Contractors

Heat pumps with electric drive, 1 and 2-stage
Table of Contents

Advertisement

Preparing for installation
Requirements regarding on-site connections
Install hydraulic connections on site
stress-free.
Cable lengths in the heat pump plus wall clearance:
Type
Heat pump control unit pow-
er supply (230 V~)
Compressor power supply
(400 V~)
Additional connecting ca-
bles
Recommended power cables for all types:
Component
Heat pump control unit (230 V~)
■ Without power-OFF contact
■ With power-OFF contact
Compressor (400 V~)
Instantaneous heating water
heater (400 V~, if installed):

Siting requirements

!
Please note
Prevent damage to the appliance
during handling.
Never put weight on the top, front
or side panels of the appliance.
Installation room requirements
!
Please note
The installation room must be dry
and free from the risk of frost.
Ensure ambient temperatures
between 0 and 35 °C.
22
BW and BWC
1.0 m
1.0 m
1.0 m
Cable cross-section
2
3 x 1.5 mm
2
5 x 1.5 mm
2
5 x 2.5 mm
2
5 x 2.5 mm
!
!
(cont.)
BWS
The power is supplied via
connecting cable.
1.0 m
Connecting cable
Max. cable length
40 m
40 m
50 m
50 m
Please note
Tilting the compressor at a steep
angle inside the heat pump can
result in appliance damage.
Max. tilting angle 45 °
Please note
Avoid risks of explosion due to
dust, gases and vapours.
Avoid dust, gases and vapours in
the installation room.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bw 351.a07Bws 351.a07Bwc 351.a07

Table of Contents