Download Print this page

Operation Instructions - Southbend RG24-5 Operator's Manual

Gas fired steamers

Advertisement

INSTALLATION AND OPERATION MANUAL, GAS FIRED STEAMER,
Delime (if so equipped)
Closes the drain valve while CLR liquid is being poured into the generator during the Delime
procedure.
Delime Generator Light (if so equipped)
Indicates that lime scale deposits have accumulated in the steam generator and that a DELIME
procedure should be performed at the next convenient opportunity.
Ignition Light
When lit, indicates burners have been ignited and are heating the generator tank.
WARNING: In the event of main burner ignition failure, a 5 minute
purge period must be observed prior to re-establishing ignition
source. If so equipped, some units will automatically re-attempt
ignition.
WARNING: In the event a gas odour is detected, shut down
equipment at the main shut off valve and contact the local gas
company or gas supplier for service.
LIGHTING
1. Ensure power, gas and water supply is on.
2. Turn power switch "ON".
3. Generator tank will begin filling with water.
4. Once water level has been reached, the ignition light should come on and remain on until
ready light comes on.
5. Steamer is now ready for use.
MANUAL 1195732 REV0 (11/22/2011)
MODELS RG24-5, SX-34GC, SX-55GC

OPERATION INSTRUCTIONS

13
HEAVY DUTY STEAM

Advertisement

loading

This manual is also suitable for:

Sx-34gcSx-55gc