Use PVC primer and solvent cement or ABS solvent cement meeting ASTM specifications, refer to TABLE 5. As an alter-
nate, use all purpose cement, to bond ABS, PVC, or CPVC pipe when using fittings and pipe made of the same materials.
Use transition solvent cement when bonding ABS to either PVC or CPVC. Low temperature solvent cement is recom-
mended. Metal or plastic strapping may be used for vent pipe hangers. Uniformly apply a liberal coat of PVC primer for
PVC.
Vent Pipe
Input Size
Dia. in.
1-1/2
6
2
070
2-1/2
3
2
090
2-1/2
3
2
110
2-1/2
3
135
3
NOTE - Standard Terminations do not include any vent pipe or elbows external to the structure. Any vent pipe or elbows external to the structure must be included in total
vent length calculations. See vent length tables.
* Kits must be properly installed according to kit instructions.
1Requires field-provided outdoor 1-1/2" exhaust accelerator.
2Concentric kits 71M80 and 44W92 include 1-1/2 in. outdoor accelerator, when used with 070 input models. When 1-1/2 in. pipe is used it must transition to 2 in. pipe with
the concentric kit.
3 Flush mount kits 51W11 and 51W12 includes 1-1/2 in. outdoor exhaust accelerator, required when used with 070 and 090 input models. When 1-1/2 in. pipe is used it
must transition to 2 in. pipe with the flush mount kit.
4 Termination kits 30G28, 44W92, 4493 and 81J20 are certified to ULC S636 for use in Canada only.
5 See table 7 for vent accelerator requirements.
6 2 in. to 1-1/2 in. field provided reducer required.

Joint Cementing Procedure

All cementing of joints should be done according to the specifications outlined in ASTM D 2855.
NOTE - A sheet metal screw may be used to secure the
intake pipe to the connector, if desired. Use a drill or self
tapping screw to make a pilot hole.
DANGER
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before
placing unit into operation.
1 - Measure and cut vent pipe to desired length.
2 - Debur and chamfer end of pipe, removing any
ridges or rough edges. If end is not chamfered,
edge of pipe may remove cement from fitting socket
and result in a leaking joint.
OUTDOOR TERMINATION USAGE*
STANDARD
Wall Kit
Flush Mount
Kit
2 inch
51W11 (US)
22G44 (US)
51W12
30G28 (CA)
4
(CA)
YES
YES
3
YES
YES
3
YES
YES
3
YES
YES
3
YES
3
YES
3
YES
3
YES
YES
YES
YES
TABLE 6
3 inch
Field
Fabricated
44J40 (US)
81J20 (CA)
4
YES
YES
1
5
YES
YES
1
5
YES
YES
1
5
YES
YES
1
5
YES
YES
5
YES
YES
5
YES
YES
5
YES
YES
5
YES
YES
5
YES
YES
5
YES
YES
5
NOTE - Check the inside of vent pipe thoroughly for any
obstruction that may alter furnace operation.
3 - Clean and dry surfaces to be joined.
4 - Test fit joint and mark depth of fitting on outside of
pipe.
5 - Uniformly apply a liberal coat of PVC primer for
PVC or use a clean dry cloth for ABS to clean inside
socket surface of fitting and male end of pipe to
depth of fitting socket.
6 - Promptly apply solvent cement to end of pipe and
inside socket surface of fitting. Cement should be
applied lightly but uniformly to inside of socket. Take
care to keep excess cement out of socket. Apply
second coat to end of pipe.
NOTE - Time is critical at this stage. Do not allow prim-
er to dry before applying cement.
Page 14
CONCENTRIC
1-1.2 inch
2 inch
71M80 (US)
69M29 (US)
44W92
44W92
4
4
(CA)
(CA)
YES
2
YES
2
YES
2
YES
2
YES
YES
YES
YES
YES
YES
3 inch
60L46 (US)
44W93
4
(CA)
YES
YES
YES
YES
YES
YES
YES

Advertisement

Table of Contents
loading

This manual is also suitable for:

Signature slp99uh070xv36bSignature slp99uh090xv36cSignature slp99uh090xv48cSignature slp99uh090xv60cSignature slp99uh110xv60cSignature slp99uh135xv60d ... Show all

Table of Contents