Electrical Installation; Wiring Junction Box - Monessen Hearth AVFL42NTSC-SR Installation & Operating Instructions Manual

Vent free fireplace
Table of Contents

Advertisement

ELECTRICAL INSTALLATION

WIRING JUNCTION BOX

1. Before installing, wire the receptacle into an electrical
circuit. This should be done before framing the fire-
place. Wire with minimum 60° C wire in accordance
with prevailing codes.
2. Remove the external junction box cover by removing
the screw from the right side of the outside firebox wall.
Junction box was installed at the factory.
3. The junction box cover has a factory installed "romex"
style strain relief connector. After connecting the wires,
route the wire leads through this connector.
Label all wires prior to disconnection when
servicing controls. Wiring errors can cause
improper and dangerous operation. Verify
proper operation after servicing.
For vent free SC System, the unit will continue to burn
during power loss to AC only with batteries installed.
Without power, the unit will shut down without batteries
installed but can be started with fresh batteries installed
from the Command Center.
Junction Box
Figure 9 –
Junction Box Wiring Diagram
FP1912
Junction box wiring
8/08
Monessen • AVFL42NTSC-SR Installation Instructions • 4116-900 Rev. B • 10/19
120V AC
60Hz
Factory Supplied
Not Supplied
Electrical connections should only be performed
by a qualified licensed electrician. Main power
supply must be turned off before connecting to
the main electrical power supply or performing
service.
Electrical Grounding Instructions:
This appliance is equipped with a three-prong
(grounding) plug for your protection against
shock hazard and should be plugged directly
into a properly grounded three prong recepta-
cle.
IMPORTANT: Always check local building codes. This in-
stallation must comply with local regulations as well as
the National Electric Code.
AVFL Vent Free Fireplace
15

Advertisement

Table of Contents
loading

Table of Contents