Installing The Vent Termination - International comfort products B Series Installation Instructions Manual

Single−stage, psc blower motor 35" tall, high efficiency condensing gas furnace
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
WARNING
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal
injury or death.
DO NOT use cement to join polypropylene venting
systems. Follow the polypropylene venting system
manufacturer's instructions for installing polypropylene
venting systems.
Figure 55
Combustion Air Pipe
Point elbow down towards
back of furnace
12" (256mm) minimum
60"(1524 mm) or
1 additional elbow maximum
CASING SIDE ATTACHMENT
COMBUSTION AIR PIPE
(NON-DIRECT VENT)

Installing the Vent Termination

Roof Terminations
A roof termination of any type will require a 4-in. (102 mm)
flashing for a 2−in. (50 mm ND) concentric vent or a 5−in.
diameter (127 mm) flashing for a 3-in. (80 mm ND) concentric
vent kit. For two-pipe or single pipe vent systems, a flashing for
each pipe of the required diameter will be necessary.
It is recommended that the flashing be installed by a roofer or
competent professional prior to installing the concentric vent.
The terminations can be installed on a flat or pitched roof.
Concentric Vent
Single or multiple concentric vent must be installed as shown in
Figure 47. Maintain the required separation distance between
vents or pairs of vents as shown in Figure 47
clearance shown in Figure 58.
WARNING
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal
injury or death.
DO NOT use cement to join polypropylene venting
systems. Follow the polypropylene venting system
manufacturer's instructions for installing polypropylene
venting systems.
48
to
L12F042
and all
Specifications subject to change without notice.
NOTE:
Follow the instructions of the vent terminal
manufacturer. These instructions are provided as a reference
only.
Cut one 4−in. (102 mm) diameter hole for 2−in. (50 mm ND) kit,
or one 5−in. (127 mm) diameter hole for 3−in. (80 mm ND) kit in
the desired location.
Loosely assemble concentric vent/combustion air termination
components together using instructions in kit.
Slide assembled kit with rain shield REMOVED through hole in
wall or roof flashing.
NOTE: Do not allow insulation or other materials to accumulate
inside of pipe assembly when installing it through hole.
Disassemble loose pipe fittings. Clean and cement using same
procedures as used for system piping. DO NOT CEMENT
POLYPROPYLENE FITTINGS.
Two−Pipe and Single−Pipe Terminations
Single and two pipe vent must be installed as shown in
Figure 47 and Figure 48. Maintain the required separation
distance between vents or pairs of vents as shown in
Figure 47 and Figure 48 and all clearance shown in Figure 58
or Figure 59.
NOTICE
RECOMMENDED SUPPORT FOR VENT TERMINA-
TIONS
It is recommended that rooftop vent terminations in
excess of 36 inches (1.0 M) in vertical length be
supported by EITHER the Direct Vent Termination Kit
shown in Table 12 or by field-supplied brackets or
supports fastened to the structure.
Cut the required number of holes in the roof or sidewall for vent
and (when used) combustion air pipes. Sidewall holes for
two-pipe vent terminations should be side-by-side, allowing
space between the pipes for the elbows to fit on the pipes.
Holes in the roof for direct−vent (two−pipe) two pipe
terminations should be spaced no more than 18−in. (457 mm)
apart to help avoid vent gas recirculation into combustion air
intake.
Termination elbows will be installed after the vent and (if used)
combustion air pipe is installed.
Sidewall Terminations
Concentric Vent
NOTE:
Follow the instructions of the vent terminal
manufacturer. These instructions are provided as a reference,
only.
Determine an appropriate location for termination kit using the
guidelines provided in section "Locating The Vent Termination"
in this instruction.
1. Cut one 4−in. diameter hole for 2−in. kit, or one 5−in.
diameter hole for 3−in. kit.
2. Loosely
assemble
concentric
termination components together using instructions in kit.
3. Slide assembled kit with rain shield REMOVED through
hole.
NOTE: Do not allow insulation or other materials to accumulate
inside of pipe assembly when installing it through hole.
4. Locate assembly through sidewall with rain shield
positioned no more than 1−in. (25 mm) from wall as
shown in Figure 47.
Gas Furnace: N9MSB
vent/combustion
air
440 01 4102 01

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9msb

Table of Contents