Payne PG92ESA Installation, Start-Up, Operating And Service And Maintenance Instructions page 55

Single-stage 35-in. (889 mm) tall 4-way multipoise condensing gas furnace
Hide thumbs Also See for PG92ESA:
Table of Contents

Advertisement

7
1
3
2
&
5
UPFLOW LEFT CONFIGURATION
Any other unused
knockout may be used
for combustion air
connection.
Rotate vent elbow to
required position.
UPFLOW RIGHT CONFIGURATION
Any other unused
knockout may be used
for combustion air
connection.
UPFLOW VERTICAL VENT
Fig. 47 - - Upflow Configurations (Appearance may vary)
See "Notes for Venting Options"
6
Any other unused
knockout may be used
for combustion air
connection.
Rotate vent elbow to
4
5
required position.
A11309A
7
6
2
5
1
3
4
5
A11308A
7
6
A11310A
DOWNFLOW LEFT CONFIGURATION
Any other unused
knockout may be used
for combustion air
connection.
DOWNFLOW RIGHT CONFIGURATION
3
2
5
1
4
5
Fig. 48 - - Downflow Configurations (Appearance may vary)
See "Notes for Venting Options"
55
Rotate vent elbow to
3
required position.
2
5
4
5
1
6
7
Rotate vent elbow to
required position.
4 5
Requires Accessory Internal Vent Kit.
See Product Data for current kit number.
DOWNFLOW VERTICAL
A11311A
2
5
3
1
6
7
A11312A
A11313A

Advertisement

Table of Contents
loading

Table of Contents