Payne PG92ESA Installation, Start-Up, Operating And Service And Maintenance Instructions page 42

Single-stage 35-in. (889 mm) tall 4-way multipoise condensing gas furnace
Hide thumbs Also See for PG92ESA:
Table of Contents

Advertisement

A combustion air pipe to the outdoors is not required for a
single- -pipe vent system. A 12-in. (304 mm) long pipe with a 2- -in.
(51 mm) tight radius 90 degree elbow is required to be attached to
the combustion air pipe adapter on the furnace. See Fig. 57. This
short inlet air pipe helps to ensure stable combustion, as well as
allow for sound attenuation. To aid sound attenuation, point the
inlet air pipe away from occupants. An extra elbow and/or five
feet of pipe may be used to accomplish the sound attenuation
function.
NOTICE
OPTIONAL VENTING BELOW THE FURNACE
The venting system may be positioned below the furnace
ONLY IF the factory accessory External Vent Trap Kit is used.
The External Vent Trap Kit is only approved for PVC/ABS
DWV venting systems.
CAREFULLY
FOLLOW
PROVIDED WITH THE EXTERNAL VENT TRAP KIT
FOR LAYING OUT THE VENTING SYSTEM AND
THE DRAIN SYSTEM. The instructions included with this
furnace DO NOT APPLY to vent systems that are located
below the furnace.
WARNING
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow the instructions outlined below for each
appliance being placed into operation could result in carbon
monoxide poisoning or death.
The instructions included with this furnace DO NOT APPLY
to vent systems that are located below the furnace.
CAREFULLY
FOLLOW
PROVIDED WITH THE EXTERNAL VENT TRAP KIT
FOR LAYING OUT THE VENTING SYSTEM AND
THE DRAIN SYSTEM when all or part of the venting
system is placed below the furnace.
Proper configuration of the venting and drain system is critical
when placing all or part of the venting system below the level
of the furnace. VENT GASSES COULD BE RELEASED
FROM THE DRAINAGE SYSTEM if the instructions
provided with the External Vent Trap Kit are not followed.
Locating the Vent Termination
General
NOTE:
Termination Requirements for the Provinces of
Alberta and Saskatchewan are located at the end of this
section.
Combustion- -air inlet pipe (direct vent/2- -pipe system only) and
vent pipe must terminate outside structure, either through sidewall
or roof.
Special termination requirements may be required in other
Canadian provinces. Refer to the authority having jurisdiction for
clarification and/or additional clearance requirements.
For vent termination clearance, references to National codes are
shown in Fig. 53 for Direct Vent/2- -Pipe system and Fig. 54 for
Ventilated Combustion Air/Non- -direct Vent/1- -Pipe system. For
exterior termination arrangements, refer to Fig. 55 for Direct
Vent/2- -Pipe system and Fig. 56 for Ventilated Combustion
Air/Non- -Direct/1- -Pipe system. Contact Local code authorities for
other requirements to and/or exemptions from the National codes
shown in the figures.
Roof termination is the recommended termination location. Roof
terminations provide better performance against sustained
THE
INSTRUCTIONS
THE
INSTRUCTIONS
prevailing winds. The roof location is preferred since the vent and
combustion
air system is less susceptible
contamination. The
termination is usually located away from
adjacent structures or other
windows, doors or other appliances. It is less prone to icing
conditions, and it often has less visible vent vapors.
Sidewall terminations may require sealing or shielding of building
surfaces with a corrosive resistance material due to the corrosive
properties of combustion products from the vent system, as well as
protection of adjacent structures.
NOTICE
RECOMMENDED SUPPORT FOR
VENT TERMINATIONS
It is recommended that sidewall vent terminations in excess of
24 inches (0.6 M) or rooftop terminations in excess of 36
inches (1 M) in vertical length be supported by EITHER the
Direct Vent Termination Kit shown in Table 12 or by
field- -supplied brackets or supports fastened to the structure.
When determining appropriate location for termination, consider
the following guidelines:
1. Comply with all clearance requirements stated in Fig. 53 or
Fig. 54 per application.
2. The vent termination must be located at least 3 feet from an
inside corner and follow the clearance distances in the
Inside Corner Termination drawing.
3. Termination or termination kit should be positioned where
vent vapors will not damage plants/shrubs, air conditioning
equipment or utility meters.
4. Do not locate termination directly into prevailing winds.
Termination should be positioned so that it will not be
affected by sustained prevailing winds over 30 mph, wind
eddy, such as inside building corners, or by recirculation of
flue gases, airborne leaves, or light snow.
5. Termination or termination kit should be positioned where it
will not be damaged by or subjected to foreign objects such
as stones, balls, etc.
6. Termination or termination kit should be positioned where
vent vapors are not objectionable.
Direct Vent / 2-Pipe System
Direct vent (2- -pipe) vent and combustion air pipes must terminate
outside the structure. See Fig. 53 For references to vent clearances
required by National code authorities.
combustion air terminations are shown in Fig. 55.
WARNING
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow the instructions outlined below for each
appliance being placed into operation could result in carbon
monoxide poisoning or death.
For all venting configurations for this appliance and other gas
appliances placed into operation for the structure, provisions
for adequate combustion, ventilation, and dilution air must be
provided in accordance with:
U.S.A. Installations: Section 9.3 of current edition of NFPA
54/ANSI Z223.1 Air for Combustion and Ventilation and
applicable provisions of the local building codes.
Canadian Installations:
CAN/CSA- -B149.1.
Appliances and all authorities having jurisdiction.
42
to damage or
obstacles such as inside corners,
Allowable vent and
Part 8 of current edition of
Venting Systems and Air Supply for

Advertisement

Table of Contents
loading

Table of Contents