Note
To prevent damage of power cable, the cable entry hole is fitted with bushing for protection.
2.4 Installing Indoor Unit
2.4.1 Equipment Room Requirement
The requirements on the equipment room are as follows:
1. Damp proof and heat preservation work must be well done to make sure that the environment control system in the
air conditioner room can operate normally.
2. The equipment room should have good heat insulation and sealed damp proof layer. The damp proof layer of the
ceiling and walls must use polyethylene film or damp proof coating.
3. The outdoor air that enters the equipment room should be reduced to a minimum, better below 5% of the total
indoor airflow, as it may increase the load of heating, cooling, humidifying and dehumidification of the system.
4. All the doors and windows should be closed and the openings should be as narrow as possible.
Note
The Liebert CRV+ series air conditioner is a professional device, and the indoor unit is prohibited to be used in an open atrocious
outdoor environment.
2.4.2 Installation Space
The Liebert CRV+ series air conditioner is a set of full-featured steam compressor refrigerating air-cooled unit. It is
recommended to be installed in a row of cabinets with high heat density and 'hot aisle & cold aisle' arrangement.
Maintenance space requirement
In normal condition, leave more than 600mm of maintenance space at the front and the rear of the air condition unit,
as shown in Figure 2-12.
Figure 2-12 Maintenance space of the unit (unit: mm)
Liebert CRV+ Series Air Conditioner User Manual
Chapter 2 Mechanical Installation
1945
600
600
11