Electrical Requirements; Initial Set-Up - Bunn VP17 Operating & Service Manual

Operating & service manual - vp17, vp17b
Table of Contents

Advertisement

CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.
The brewer has an attached cordset and requires 2-wire grounded service rated 120 volts ac, 15 amp, single
phase, 60 Hz.
WHITE
NEUTRAL
100V.A.C.
L1 BLACK
P2185
Electrical Hook-Up (Model "B" Only)
CAUTION – Improper electrical installation will damage electronic components.
1. An electrician must provide electrical service as specified.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Place the heater switch, located on the left front of the control panel on "B" Models, in the "OFF" (lower)
position.
4. Remove the front panel beneath the sprayhead.
5. Feed the cord through the strain relief and connect it to the terminal block.
6. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Re-
place the front panel.
CAUTION - The brewer must be disconnected from the power source throughout the initial set-up, except when
specified in the instructions.
1. Insert an empty funnel into the funnel rails.
2. Place an empty decanter under the funnel.
3. On "B" Models, place the heater switch of the brewer in the "OFF" (lower) position and connect the brewer to
the power source.
4. Pour three pitchers of tap water into the screened area on top of the brewer. Allow approximately two minutes
between pitchers for water to flow into the tank. While the third pitcher of water is entering the tank, the tank
will fill to capacity and the excess will flow from the sprayhead, out of the funnel, and into the dispenser.
5. When the flow of water from the funnel stops, place the heater switch of the brewer in the "ON" (upper) posi-
tion and wait approximately twenty minutes for the water in the tank to heat to the proper temperature. Some
water will drip from the funnel during this time; this is due to expansion and should not occur thereafter.
6. Pour one pitcher of tap water into the screened area on top of the brewer.
7. After water has stopped flowing from the funnel, allow the water in the tank to reheat to the proper tem-
perature.
8. Empty the decanter. The brewer is now ready for use in accordance with the coffee brewing instructions.

ELECTRICAL REQUIREMENTS

"B" models require 2-wire,
grounded service rated 100 volts
ac, 20 amp, single phase, 50 Hz.
Proceed as follows:

INITIAL SET-UP

Page 4
10860 061501

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vp17bVp17-2Vp17-3

Table of Contents