New Construction Installation - Broan ZB80ML1 Installation Manual

X2 | multi-speed ventilation fan with dimmable light and motion sensor
Hide thumbs Also See for ZB80ML1:
Table of Contents

Advertisement

Available languages

Available languages

Page 3

New Construction Installation

Tools needed
• Power screwdriver with a Phillips bit
• Phillips screwdriver
• Flathead screwdriver
• Pliers
• Wire insulation stripper
• Wire cutter
1
Remove Packaging
Parts Bag holds
Knockout Plate
and six (6)
screws
2
Install
Mounting
Frame
Materials needed
• 6" round metal ducting recommended for best performance.
Use of other ducting is acceptable but may impact performance.
• Roof cap or wall cap (built-in damper recommended)
• Tape to seal duct connections
• Electrical wiring and supplies per local code requirements
Remove
Instruction
Sheet
4
3
ZB80ML1 n ZB110ML1 Installation Guide
Punch out Mask from
packaging. See Step 6.
2
1

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Zb110ml1

Table of Contents