Download Print this page

Patterson-Kelley HARSCO MACH C1500 Instructions Manual page 15

Nuro conversion
Hide thumbs Also See for HARSCO MACH C1500:

Advertisement

24. Re-energize power to unit. DO NOT ENERGIZE GAS. Call tech support for help pairing
controls to boiler (570-421-7500 and press 2 for technical support).
25. After pairing is complete with technical support, re-energize gas supply to unit.
26. Perform Runout Procedure.
27. Perform factory start up and fill out start up report located in O&M manual and check all
safety devices per O&M manual to ensure all are working properly.
28. Re-Install side and top panels of boiler.
Instructions
NURO Conversion Instructions
MACH C1500-C2000H
High Limit Probe
Figure 16
Ignitor Ground Wires
Figure 17
1005101738
ENVI to NURO
Date: 12/19/2017
Revision A

Advertisement

loading

This manual is also suitable for:

Harsco mach c2000h