Start-Up Checklist - Bryant DURAPAC 579F Installation, Start-Up And Service Instructions Manual

Single package rooftop gas heating/electric cooling units durapac series sizes 180-300 15 to 25 tons
Hide thumbs Also See for DURAPAC 579F:
Table of Contents

Advertisement

MODEL NO.:
DATE:
I. PRE-START-UP
VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
VERIFY INSTALLATION OF INDOOR FAN MOTOR ADJUSTMENT BOLT AND PLATE (579F216-300 ONLY)
VERIFY INSTALLATION OF OUTDOOR AIR HOOD
VERIFY INSTALLATION OF FLUE HOOD AND WIND BAFFLE
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS
VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
CHECK GAS PIPING FOR LEAKS
CHECK THAT FILTERS AND SCREENS ARE CLEAN AND IN PLACE
VERIFY THAT UNIT IS LEVEL
CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SETSCREW
IS TIGHT
VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED
VERIFY THAT SCROLL COMPRESSORS ARE ROTATING IN THE CORRECT DIRECTION
VERIFY THAT CRANKCASE HEATER HAS BEEN ENERGIZED FOR 24 HOURS (SIZE 300 AND UNITS WITH
PERFECT HUMIDITY™ DEHUMIDIFICATION SYSTEM ONLY)
II. START-UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS — COMPRESSOR NO. 1
— COMPRESSOR NO. 2
SUPPLY FAN AMPS
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
RETURN-AIR TEMPERATURE
COOLING SUPPLY AIR
GAS HEAT SUPPLY AIR
PRESSURES
GAS INLET PRESSURE
GAS MANIFOLD PRESSURE
REFRIGERANT SUCTION
REFRIGERANT DISCHARGE
VERIFY REFRIGERANT CHARGE USING CHARGING CHART ON PAGE 32.
GENERAL
ECONOMI$ERIV MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS
Copyright 2006 Bryant Heating & Cooling Systems

START-UP CHECKLIST

SERIAL NO.:
TECHNICIAN:
L1-L2
L1
L1
EXHAUST FAN AMPS
F DB (Dry-Bulb)
F DB
F
F
STAGE NO. 1
CIRCUIT NO. 1
CIRCUIT NO. 1
Printed in U.S.A.
L2-L3
L2
L2
F WB (Wet-Bulb)
IN. WG
IN. WG
STAGE NO. 2
PSIG
CIRCUIT NO. 2
PSIG
CIRCUIT NO. 2
CL-1
L3-L1
L3
L3
IN. WG
PSIG
PSIG
CATALOG NO. 04-53579001-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents