Accessories - Bryant 355M-40-4 Installation And Operating Instructions Manual

Series d deluxe 4-way multipoise variable-capacity direct-vent condensing gas furnace
Table of Contents

Advertisement

VOLTS—
UNIT
HERTZ—
SIZE
PHASE
Maximum*
042040
115—60—1
042060
115—60—1
042080
115—60—1
060080
115—60—1
060100
115—60—1
060120
115—60—1
* Permissible limits of voltage range at which unit will operate satisfactorily.
† Unit ampacity = 125 percent of largest operating component's full load amps plus 100 percent of all other potential operating components' (EAC, humidifier, etc.) full load
amps.
‡ Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.
** Time-delay fuse is recommended.
NOTE: Use AWG No. 18 color-coded copper thermostat wire for
lengths up to 100 ft. For wire lengths over 100 ft, use AWG No.
16 wire.
NOTE: For 2-speed applications, refer to Sequence of Operation
section.
III. ACCESSORIES
1. Electronic Air Cleaner (EAC)
The control center EAC terminals are energized with 115v
(1.5-amp maximum) during blower operation.
a. Two extension leads are connected to the control center
EAC terminals to assist field installation of an EAC. (See
Fig. 25.) To use these leads, proceed with the following:
(1.) Strip EAC power lead insulation approximately 1/4
in.
(2.) Insert stripped end into factory-supplied black
lead's butt connector and crimp to secure.
(3.) Strip EAC neutral lead insulation approximately 1/4
in.
EAC-ELECTRONIC AIR
CLEANER TERMINALS
(115-VAC 1 AMP MAX)
MAIN BLOWER
CONTROL WIRE
CONTINUOUS
FAN (CF) SETUP
TABLE 4—ELECTRICAL DATA
OPERATING
MAXIMUM
VOLTAGE RANGE
UNIT
AMPS
Minimum*
127
104
8.9
127
104
8.9
127
104
8.9
127
104
13.8
127
104
13.8
127
104
11.6
CONNECTOR
TRANSFORMER
24-V CONNECTORS
SWITCHES
COMMUNICATION
CONNECTOR
Fig. 25—Control Center
MINIMUM
UNIT
WIRE
AMPACITY†
SIZE
12.0
14
12.0
14
12.0
14
17.9
12
18.1
12
15.3
12
(4.) Insert stripped end into factory-supplied white
leads's butt connector and crimp to secure.
NOTE: If desired, cut butt connectors off factory leads and strip
insulation approximately 1/4 in and use field-supplied wire nuts to
connect.
b. An alternate method to attach EAC lead to control center
is the following procedure:
(1.) Remove 2 screws securing the control box to
furnace blower shelf.
(2.) Remove and discard 2 factory-supplied leads from
control center EAC terminals.
(3.) Strip EAC power leads insulation approximately
1/8 in.
NOTE: The control center EAC terminals are sized for 12 gage
maximum, solid or stranded wire.
(4.) Route EAC leads through right-hand wire grommet.
HOT SURFACE
IGNITOR CONNECTOR
115-V
CONNECTORS
24-V THERMOSTAT
TERMINALS
—20—
MAXIMUM WIRE
MAXIMUM FUSE OR
LENGTH (FT)‡
CKT BKR AMPS**
31
31
31
32
32
37
PRESSURE SWITCH
CONNECTOR
HUM-HUMIDIFIER
TERMINAL
(24-VAC 0.5 AMP MAX)
DEHUMIDIFIER (DH)
CONNECTOR
3-AMP FUSE
STATUS AND DIAGNOSTIC
LED LIGHTS
AIR CONDITIONING
(A/C) SETUP SWITCH
SETUP SWITCHES
(SW) AND BLOWER
OFF DELAY SETUP
SWITCHES
MODEL PLUG
15
15
15
20
20
20
A93062

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bryant 355m-40-5355mav

Table of Contents