9. CHECKOUT and STARTUP

The Checkout and Startup procedure prepares a recently installed or repaired Combi for operation. The
procedures check proper electrical, gas, water, and drain connections to the Combi, and verify basic
Combi operation.
TASK
Preparation
Check operating location clearances.
Test supply water quality.
Verify Exhaust Hood Requirements.
Verify Electric Power Requirements.
Installation
Check electrical line connection
Check water supply connection
Leak Test water supply lines
Verify Combi is level
Check drain line connection
Check Exhaust Hood
Perform Startup Test
Notes:
Table 2-5 Installation Check List
REFERENCE
Page No.
16,17
11
16
10
9
11
11
18,19
14
16
21
20
COMPLETED