Dv Stove Horizontal Termination Vent Kit; Dv Stove Horizontal Vent Kit (Parts #946-116 & #946-216) Installation - HAMPTON BAY H35E-11 Owners & Installation Manual

Direct vent gas fireplace
Table of Contents

Advertisement

installation

DV Stove Horizontal Termination Vent Kit

DV 2 ft. Stove Vent Kit (Part # 946-116) and DV 4 ft. Stove Vent Kit (Part #946-216) includes all the parts
needed to install the H35 Direct Vent unit with minimum horizontal and vertical vent dimensions. For in-
stallations that require longer vertical and/or horizontal vents use the Dura-Vent system as shown in the
"Dura-Vent Termination Kit" and "Dura-Vent Venting Components" sections.
Qty.
1)
1
Rigid Pipe Section (Kit # 946-116: 2 ft. (1.2m) length,
Kit # 946-216: 4 ft. (1.2m) length), 6-1/2" (165mm)
inside diameter
2)
1
Flex Liner, compressed aluminium 2 ply liner, 4" (102mm)
inside diameter
3)
4
Spring Spacers
4)
1
90 deg. Elbow
5)
1
Adjustable pipe section 13-1/2" to 24" (343mm x 610mm), 2 pcs.
6)
1
Thimble Cover
7)
1
Wall Thimble (2 pcs.)
8)
1
Adaptor
9)
AstroCap Termination Cap
1
10)
2
Trim Collars
11)
1
Tube of Mill-Pac, high temperature sealant
12)
12
Screws, #8 x 1/2" Self tapping, Stainless Steel
13)
14
Screws, #8 x 1/2" Self tapping, Black
14)
4
Screws #8 x 1-1/2" Drill Point, Black
15)
4
Screws #8 x 1-1/2" Drill Point, Stainless Steel
16)
8
Wood screws #8 x 1"
DV Stove Horizontal Vent Kit (Parts #946-116 & #946-216) Installation
Review the following sequence of instructions which
are typical of most installations. The sequence may
vary depending on wall thickness. See "Exterior
Vent Terminal Locations" to "Venting Arrange-
ments" section for vent location and clearance
dimensions, and the "Vent Restrictor Position"
section to set the Vent Restrictor to the cor-
rect position.
1) Set the unit in its desired location. Check to
determine if wall studs will be in the way of the
venting system, adjust location until all clear-
ances are met and there are no obstructions.
Note: A 1-1/2"(38mm) clearance around
the outer pipe must be maintained
except that only a 1" (25mm) clear-
ance is needed at the termination
end.
IMPORTANT:
Do not locate termination hood where
excessive snow or ice buildup may
occur. Be sure to check vent termina-
tion area after snow falls, and clear to
prevent accidental blockage of vent-
ing system. When using snow blow-
ers, make sure snow is not directed
towards vent termination area.
|
32
Hampton
H35E-11 Direct Vent Freestanding Gas Stove
®
Description
2) Assemble a trial fit to determine the vertical
center-line for the vent termination.
a) Cut a 9-1/2" x 9-1/2" (241mm x 241 mm)
square hole on both the interior and exterior
wall.
Note:
a) Liner sections should be continu-
ous without any joints or seams.
b) This is an approved system, there-
fore components in this system
must not be substituted for any
other manufacturer's products.
b) Install wall thimbles on both interior and
exterior wall with 4 wood screws (#8 x
1") per thimble.
c) Attach the 2 piece adjustable pipe section
to the vent terminal and slide into position
from the exterior. The larger diameter
end of the adjustable pipe goes to the
vent terminal.
d) Install the 90
elbow onto the adjustable
o
pipe to determine the vertical centerline.
Note: if the centerline cannot be met,
the adjustable sections will have to
be cut.
e) Cut the 4 ft. section of rigid pipe to length.
Attach the 45
elbow to the rigid pipe,
o
and ensure that the pipe length when cut
(with the 45
elbow) will seat onto both the
o
starter collar and the 90
elbow. Crimped
o
section of rigid pipe seats into the 90
elbow. Only cut the uncrimped side of
pipe.
Dismantle all pipe sections including vent
terminal.
o

Advertisement

Table of Contents
loading

Table of Contents