Start-Up Checklist - Bryant 559F Installation, Start-Up And Service Instructions Manual

Single package rooftop electric heating/electric cooling units
Hide thumbs Also See for 559F:
Table of Contents

Advertisement

MODEL NO.:
DATE:
I. PRE-START-UP:
VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
VERIFY INSTALLATION OF INDOOR FAN MOTOR ADJUSTMENT BOLT (180 UNITS) OR ADJUSTMENT
BOLT AND PLATE (216-300 UNITS)
OPEN ALL SERVICE VALVES (SUCTION, DISCHARGE, AND LIQUID)
VERIFY INSTALLATION OF ECONOMIZER HOOD
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS
VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
CHECK THAT INDOOR-AIR FILTER IS CLEAN AND IN PLACE
VERIFY THAT UNIT IS LEVEL
CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SET SCREW
IS TIGHT
VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED
VERIFY THAT SCROLL COMPRESSOR IS ROTATING IN THE CORRECT DIRECTION
II. START-UP:
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS — COMPRESSOR NO. 1
SUPPLY FAN AMPS
ELECTRIC HEAT AMPS (IF SO EQUIPPED)
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
RETURN-AIR TEMPERATURE
COOLING SUPPLY AIR
ELECTRIC HEAT SUPPLY AIR (IF SO EQUIPPED)
PRESSURES
REFRIGERANT SUCTION
REFRIGERANT DISCHARGE
VERIFY REFRIGERANT CHARGE USING CHARGING CHART ON PAGE 24
GENERAL
ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS
VERIFY INSTALLATION OF ALL OPTIONS AND ACCESSORIES
Copyright 1998 Bryant Heating & Cooling Systems

START-UP CHECKLIST

L1-L2
— COMPRESSOR NO. 2
CIRCUIT NO. 1
CIRCUIT NO. 1
SERIAL NO.:
TECHNICIAN:
L2-L3
L1
L1
EXHAUST FAN AMPS
L1
L2
F
DB (Dry-Bulb)
F
DB
F
F
PSIG
CIRCUIT NO. 2 (216-300 ONLY)
PSIG
CIRCUIT NO. 2 (216-300 ONLY)
CL-1
L3-L1
L2
L3
L2
L3
L3
F
WB (Wet-Bulb)
CATALOG NO. 5355-900
PSIG
PSIG