3. Installation
3-9. Installing the liquid cooling tank, optional
3-10. Installing the vibrating bowl
3-11. Installing the control box (for vibrating bowl)
12
1. Remove the rubber plug, and then push the liquid
cooling tank q.
2. Tighten it with the set screw w.
1. Install the vibration bowl q with bolts w, spring wash-
ers e, and washers r.
2. Pass the wires from the vibration bowl q through the
hole in the table.
1. Mount the control box q to the bottom of the box stay
e with screws w.
2. Mount the control box stay e to the bottom of the work
table with wood screws r.
LK3-B448E MARK
II
/BA-16