Swing Motors - Daikin FTXR28EV1B9 Service Manual

Removal procedure
Hide thumbs Also See for FTXR28EV1B9:
Table of Contents

Advertisement

Swing Motors

10.Swing Motors
Warning
Caution
Step
1. Remove the swing motors
for horizontal blades.
1
Cut the clamp.
2
Release the lead wire
for the swing motors
from the 3 hooks.
Remove the 3 screws
3
and remove the 2
swing motors.
2. Remove the swing motor
for vertical blades.
Remove the screw of
1
the drain hose.
Remove the 2 screws
2
of the swing motor
assembly.
22
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
When reassembling, do not confuse the installing order of the 2 motors for horizontal
blades and the colors of the connectors.
If you set the connectors or motors opposite, the horizontal blades do not move
smoothly or noise may be heard.
Procedure
Clamp
Hook
For upper blade
Swing motor assembly
Reassembling order
(1) Set the swing motor for the
upper blade first.
(connector: green)
(2) Then, set the swing motor
for the lower blade.
(connector: red)
(3) Fix both swing motors with a
screw.
(R18703)
For lower blade
(R13970)
(R5733)
(R13971)
Si041260
Points
Removal Procedure

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ftxr42ev1b9Ftxr50ev1b9

Table of Contents