Hardware Installation; Wall Mount Installation - Planet WGS-5225-8UP2SV Quick Installation Manual

Industrial l2+ 8-port 10/100/1ooot 802.3bt poe + 2-port 1g/2.5g sfp wall-mount managed switch with lcd touch screen
Table of Contents

Advertisement

3. Hardware Installation

3.1 Wall Mount Installation

To install the Wall-mount Managed Switch on the wall, simply follow the following
steps:
Step 1: Drill 4 holes with 8mm diameter on the wall. The horizontal and vertical
distances between the 2 holes are 230mm and 124mm, respectively.
Ø4mm
Ø8mm
Step 2: Hammer the four anchors into the four holes.
1
Step 3: Then the four given screws are screwed into the anchors to finish the
wall-mount installation, as shown below.
230mm
2 3 0 m m
Du al po
we r inp ut
for ma xim
is req uir
um Po E
ed
loa din g.
V1
PW R 1
V1 +
V2
PW R 2
V2 +
DC Inp ut
Ra ng e
48 -54 V
, 8A ma
x.
Sm ar t LC
D
Fi be r
M an ag ed
100 0
W GS -52
1
LN K/A CT
25 -8U P2
10/ 100
2
SV
LN K/A CT
3
bt Po E-i
n-U se
4
at Po E-i
n-U se
5
6
2
Ma x. Fa
ult Ala rm
Lo ad ing
: 24 V, 1A
1 2 4 m m
PW R 1
PW R 2
Rin g
R.O .
1G /2.5 G
LN K
AC T
100
9
LN K
AC T
SF P
10
7
8
Po E+ +
SF P
9
10
124mm
5

Advertisement

Table of Contents
loading

Table of Contents