Download Print this page

Rinnai CAH Series Instalation And Operating Manual page 6

Advertisement

When transporting components of the hydronic
air handler, follow the guidelines below:
• Choose the correct hand truck to support
the weight and size of the system
components. Refer to section "3.7
Specifications" for specific weights and
dimensions.
• Use safe lifting and material handling
principles to prevent workplace accidents.
• Use proper lifting techniques to load the
equipment onto a hand truck.
• Position the equipment onto the hand
truck so the weight is evenly balanced.
• Use personal protective equipment, such
as gloves and steel-toed boots.
If storing components of the hydronic air
handler, follow the guidelines below:
• Store system components in a clean, dry
environment.
• Components must be protected from
direct sunlight.
• Do not store components outdoors.
• If transported or stored at temperatures
below 32°F (0°C), the components must
be warmed up to 60°F (15°C) before the
start of assembly.
• All components must be stored in the
original packaging.
6
Example:
CAH050CE
CAH
050
Series
CAH Series
Canadian Air Handler Installation and Operation Manual
E
C
Blower Motor
E = ECM Motor
Accessory
Circulator Pump
included with the
air handler (if
applicable)
Nominal Heating Capacity
at 3GPM and 140° F
050 = 50,000 BTU

Advertisement

loading

This manual is also suitable for:

Cah050eCah050ce