Mounting; Processor Unit - Furuno FCV-38 Installation Manual

Stabilized fish size indicator
Hide thumbs Also See for FCV-38:
Table of Contents

Advertisement

1.

MOUNTING

1.1

Processor Unit

The processor unit can be installed on a deck or bulkhead.
Mounting consideration
Select a mounting location, keeping in mind the following points:
• Locate the unit out of direct sunlight and away from heat sources.
• Locate the unit away from places subject to water splash and rain.
• Select a mounting location considering the length of the cables to be connected to
the unit.
• Select a location where shock and vibration are minimal.
• Be sure the mounting location is strong enough to support the weight of the unit.
• Referring to the outline drawings at the back of this manual, allow sufficient space
for maintenance and service.
• A magnetic compass will be affected if the unit is placed too close to the magnetic
compass. Observe the compass safe distances at the front of this manual to prevent
interference to a magnetic compass.
• For bulkhead installations, secure the unit so that the cable entrance faces down-
ward.
Do not apply paint, anti-corrosive sealant or contact spray to
coating or plastic parts of the equipment.
Those items contain organic solvents that can damage
coating and plastic parts, especially plastic connectors.
NOTICE
1-1

Advertisement

Table of Contents
loading

Table of Contents