Preparing for Setup
The box the StorTrends® 3200 Storage Appliance was shipped in includes the following:
•
An 3200 Chassis
•
Two Power Cords
•
Rails
•
Rail Screws
Note:
Your StorTrends® 3200 may or may not ship with everything listed in the Retail Packing
List. Contact your AMI authorized reseller to find out what is shipped with your
StorTrends® 3200 storage appliance if the contents do not match the ones listed in this
document.
Choosing a Setup Location
•
Leave enough clearance in front of the rack to enable you to open the front door
completely (~25 inches).
•
Leave approximately 30 inches of clearance in the back of the rack to allow for
sufficient airflow and ease in servicing.
Rack Precautions
•
Ensure that the leveling jacks on the bottom of the rack are fully extended to the
floor with the full weight of the rack resting on them.
•
In a single rack installation, stabilizers should be attached to the rack.
•
In multiple rack installations, the racks should be coupled together.
•
Always make sure the rack is stable before extending a component from the rack.
•
You should extend only one component at a time - extending two or more
simultaneously may cause the rack to become unstable.
Server Precautions
•
Review the General Safety Precautions.
•
Determine the placement of each component in the rack before you install the
rails.
•
Install the heaviest server components on the bottom of the rack first, and then
work up.
•
Use a regulating uninterruptible power supply (UPS) to protect the server from
power surges, voltage spikes and to keep your system operating in case of a
power failure.
•
Allow the power supply units and hot plug Serial ATA drive to cool before
touching them.
•
Always keep the rack's front door and all panels and components on the servers
closed when not servicing to maintain proper cooling.
2
Warning
StorTrends® 3200 Set Up Guide