Download Print this page

Kohler AERODYNE K-3869T-S Installation Instruction page 4

Aerodyne 3.3/4.8l class five+

Advertisement

TO INSTALL SUPPLY
SHUT-OFF VALVE
Install the supply shut-off valve so it is
67mm (2-5/8") above the finished floor
line, and 194mm (7-5/8") to the left of
the closet flange centerline.
The centerline of the supply shut-off
valve outlet should extend 67mm
(2-5/8") from the finished wall. Install
the supply shut-off valve with the outlet
vertical.
TO INSTALL BOWL
Position the template and align with
drain hole.
Mark down the position of foot and 5
holes.
Drill holes on ground with the drill of
10mm (3/8"), then insert anchor to
holes.
CAUTION: Please make sure there is
no water pipe or spool under the 5
holes to be drilled.
Install brackets.
Firmly press the toilet gasket onto the
toilet outlet of plastic trap.
NOTE 1:
Wax ring type toilet gasket
should not be installed at temperatures
o
less than 21 C.
NOTE 2:
If you are using a toilet
gasket with an integral plastic sleeve,
make sure the gasket is positioned
with the sleeve facing away from the
toilet.
1195897-T01-G
Supply Shut-Off Valve
200
67
Closet Flange
Centerline
Fig.#3
3
Drain Hole
Fig.#4
4
Fig.#5
5
Fig.#6
6
Plastic Trap Outlet
Toilet Gasket
Fig.#7
7
-4-
mm
10mm
3/8
10mm
1
2
67
194
mm
67mm;
5
o
21
C

Advertisement

loading

This manual is also suitable for:

Aerodyne k-4165t-sAerodyne k-3869t-seAerodyne k-4165t-seAerodyne k-3869t-nseAerodyne k-4165t-nse