Package Contents; Choosing A Suitable Site - 3Com SuperStack 3 3226 Getting Started Manual

3com superstack 3 3226: user guide
Hide thumbs Also See for SuperStack 3 3226:
Table of Contents

Advertisement

20
C
2: I
HAPTER
NSTALLING THE

Package Contents

Choosing a Suitable
Site
S
WITCH
Switch unit
CD-ROM
Getting Started Guide (this guide)
Management Quick Reference Guide
Release Notes
Unit Information Labels
Warranty Information
Power Cord
2 x Mounting brackets
4 x Screws
4 x Rubber feet
The Switch is suited for use on a desktop, either free standing or
mounted in a standard 19-inch equipment rack. Alternatively, the Switch
can be mounted in a wiring closet or equipment room, as an aggregator
for other Hubs and Switches. A rack-mounting kit containing two
mounting brackets is supplied with the Switch.
CAUTION: Ensure that the ventilation holes are not obstructed.
When deciding where to position the Switch, ensure that:
Cabling is located away from:
sources of electrical noise such as radios, transmitters and
broadband amplifiers.
power lines and fluorescent lighting fixtures
The Switch is accessible and cables can be connected easily.
Water or moisture cannot enter the case of the Switch.
Air flow is not restricted around the Switch or through the vents in the
side of the Switch. 3Com recommends that you provide a minimum of
25mm (1in.) clearance.
Air temperature around the Switch does not exceed 40
If the Switch is installed in a 19-inch rack or closed assembly its local air
temperature may be greater than room ambient temperature.
(104
F).
°C
°

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3cr17500-913cr17501-91Superstack 3 3250

Table of Contents