Route The Cable Assembly - Precor Vitality Selectorized Series Assembly Manual

Abdominal / back extension
Hide thumbs Also See for Vitality Selectorized Series:
Table of Contents

Advertisement

Route the Cable Assembly

1.
Screw one end of the cable assembly into the top of the weight stack stem.
CAUTION: Be sure that at least seven (7) threads are inserted into the fitting.
2. Pull the cable through the top of the weight tower frame, over the top of the
dual pulleys, and under the cable retaining brackets.
Note: The pulleys do not need to be removed.
3. Pass the cable to the pulley at the middle of the tower upright. Thread the
cable between the cable retainers, under the pulley, and through the tower
upright.
Note: To make the following step easier, brace the top weight plate in a
raised position. Remove the brace and return the top weight plate to its
normal position after the end of the cable is in place.
4. Thread the cable under and around the pulley on the cam assembly, then
insert its end into the cable slot on the cam. Secure the cable with an
M4-15 mm screw.
Note: The screw is pre-assembled to the cam. First, remove the screw, then
install the cable into the slot on the cam and replace the screw.
Vitality Series Selectorized Line Abdominal / Back Extension Assembly Guide: Assemble the Equipment
Figure 10: Cable assembly detail
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitality selectorized c028es

Table of Contents