Pre-Installation; Final Installation; Control User Interface; Control Operation - Marshall Amplification DH1-1010 Series Owner's Manual

Heated holding unit
Table of Contents

Advertisement

OWNER'S MANUAL
MODEL DH1-1010 SERIES – HEATED HOLDING UNIT

PRE-INSTALLATION

1. The heated holding cabinet is packaged to minimize the risk of shipping damage. Immediately
upon receipt, make certain to inspect the unit(s) for damage. FILE ALL CLAIMS WITH THE
FREIGHT CARRIER.
2. Unpack and inspect the nugget cabinet. IF ANY CONCEALED DAMAGE, FILE ALL CLAIMS
WITH THE FREIGHT CARRIER.

FINAL INSTALLATION

1. Unpack unit and remove all protective paper or plastic covering from metal parts.
2. Place holding unit on stable base.
3. Plug unit into 208v L14-20 rated receptacle. Refer to the General Specifications on the front
page of the manual to find out amp load of your model.
4. Installation shall comply with the latest version of the National Electrical Code, NFPA 70.

CONTROL USER INTERFACE

Each deck in the unit is controlled by an independent time/temperature controller.
Left Channel Display
LED Indicator Lights
Left Channel

CONTROL OPERATION:

CONTROLLER POWER UP:
1. Turn on the power switch of deck(s) to be used. Upon power up, the controller will briefly show
the software version and then go to preheat mode and the display will show "PHt"
PREHEAT:
1. The controller will stay in preheat mode ("PHt") for the entire preheat period (preheat time
parameter) even though both heaters (top and bottom) have reached set points before the end of
174830 RV120817
Copyright © 2017 Marshall Air Systems, Inc.
All Rights Reserved.
Right Channel Display
Left channel
timer start/stop
button
LED Indicator Lights
Right Channel
Temperature button
Right channel
timer start/stop
button
1
Up &
Down
Arrow
Buttons
On/Off
Switch

Advertisement

Table of Contents
loading

Table of Contents