5. Electrical Installation

Prior to Installation
Follow all safety guidelines in this manual when performing
electrical wiring. Electrical installation should be conducted
by qualified personnel.
Model CXH-A/B heaters must be installed according to the
latest editions of the relevant parts of EN60079.
Disconnect power to unit prior to installation. If integral dis-
connect is being serviced, ensure that feeder service to dis-
connect is off.
Familiarize yourself with wiring diagram and wire connection
points. Wiring diagrams are located on the inside cover of the
main control enclosure. A general wiring diagram is also
included in this manual.
Ensure that proper cable glands and conduit connectors have
been selected. Cable, glands and conduit must be installed
per IEC/ATEX guidelines and must have proper hazardous
Mains Connection
The conduit / cable entry for mains power are located on the
cast control enclosure.
To access the connection points for the mains power, remove
the (18) x M12 cover bolts on the main enclosure. Once re-
moved, the (3) mains wires should be connected directly to
the heater contactor or circuit breaker (if equipped). See
figures 5 and 6 for connection points.
Figure 5: Mains Power Conduit/Cable Entries
© 2020 Chromalox,
location listings.
1"NPT Entry on top is factory equipped with a non-certified
conduit plug
Unused conduit/cable entries must be plugged with certified
stopper plugs.
Ensure that equipment is properly grounded using designated
grounding lugs.
Modification of cable/conduit entries will void third party listings
and warranty.
Wiring should be selected based on amperages listed in table
D. Use only copper conductors and approved wiring methods.
An external overcurrent device is required. Overcurrent device
should be sized based on heater amperages listed in table D
and should conform to installation location requirements.
Figure 6: Mains Power Connection