NETGEAR AV Series Hardware Installation Manual page 34

Fully managed switches
Hide thumbs Also See for AV Series:
Table of Contents

Advertisement

2
Figure 11. Package contents
To check the package contents:
1. Place the container on a clean flat surface, and cut all straps securing the container.
2. Unpack the hardware from the boxes by carefully removing the hardware and placing
it on a secure and clean surface.
3. Remove all packing material.
4. Verify that the package contains the following items:
Number
Item
1
Switch of the model that you ordered.
Note: Rubber protection caps are installed in the SFP sockets. If you install an SFP transceiver
module, you must remove the cap from the SFP socket.
2
AC power cable (varies by region).
3
USB console cable.
4
Installation guide.
5
RJ-45 RS-232 console cable.
Installation
AV Line of Fully Managed Switches M4250 Series
1
3
5
7
6
8
34
4
9
Hardware Installation Guide

Advertisement

Table of Contents
loading

Table of Contents