Operation; Tighten Fasteners; Pump Head Co2 Charging; Running The Pump - Master MVP-150XL Operation

Vapor recovery pump
Hide thumbs Also See for MVP-150XL:
Table of Contents

Advertisement

Operation

Operation
Operation

Tighten Fasteners

Fasteners
Tighten
Tighten
Fasteners
Before using the pump, check and
retorque all external fasteners. Follow
Torque Instructions, page
day of operation, retorque the fasteners.
Pump
Pump Head
Pump
Head CO
Head
CO
CO
2 2 2
In the event of a diaphragm rupture, vapor will
enter the pump head center section. To avoid fire
and explosion, always replace air in the center
section with CO
.
2
Prior to using the pump, it is necessary to replace all
air in the center section with CO
center section drives the pumping with the CO
charge. To ensure no air is present, use the following
method.
1. At the CO
port (E), close the center section vent
2
valve.
2. At the CO
port (E), open the CO
2
valve and adjust the CO
to the maximum pressure setting of 150 psi.
3. Close the CO
supply line valve and open the
2
center section vent valve.
4. Repeat steps 1–3 a second time to purge any
remaining air.
5. Repeat steps 1 & 2 to place the pump in
operational state.
The maximum pumping pressure will be a few psi
less than the internal CO
3A6887A
10. After the first
Charging
Charging
Charging
. The pump head
2
2
supply line
2
regulator to set the CO
2
pressure setting.
2
Running the
the Pump
Running
Running
the
1. Be sure the system is properly grounded. See
Grounding, page 7
2. Check fittings to be sure they are tight. Tighten
inlet and outlet fittings securely.
3. Run the pump; starting, stopping, and operating
process valves according to the extractor system
instructions.
Pressure Relief
Relief Procedure
Pressure
Pressure
Relief
Follow the Pressure Relief Procedure
whenever you see this symbol.
gas
This equipment stays pressurized until pressure is
relieved manually. To help prevent serious injury
from pressurized vapor, follow the Pressure Relief
Procedure when you stop pumping for an extended
period of time, and before you clean, check, or
service the equipment.
2
1. Remove electric power from the system.
2. Vent all LP-Gas vapor from the pump and hoses
according to extractor system instructions.
3. Close the shutoff valve on the CO
4. On CO
port (E), open the pump CO
2
and CO
supply valve.
2
NOTE: In the event of a diaphragm rupture,
NOTE:
NOTE:
LP-Gas may be present in the pump center
section. Always vent all LP-Gas according to
extractor system instructions.
5. If performing repairs, remove CO
tank from the pump prior to performing the work.

Pump Shutdown

Pump
Pump
Shutdown
Shutdown
Before you check, adjust, clean, or repair the system,
follow the
Pressure Relief Procedure, page 9
Operation
Pump
Pump
.
Procedure
Procedure
cylinder.
2
2
regulator and
2
bleed valve
.
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

25m869

Table of Contents