Step 3 — Install Machine Supports

INSTALL STANDARD ISOLATION

Figure 8 shows the position of support plates and shear flex
pads, which together form the standard machine support system.
IMPORTANT: Chiller housekeeping pad, anchor bolts, and
attachment points that are designed by others must be in ac-
cordance with all applicable national and local codes.

INSTALL ACCESSORY ISOLATION (IF REQUIRED)

Uneven floors or other considerations may dictate the use of
accessory soleplates (supplied by Carrier for field installation)
and leveling pads. Refer to Fig. 10.
Chiller support plates must be level within
one end to the other.
Level machine by using jacking screws in isolation soleplates.
Use a level at least 24-in. (600 mm) long.
TYPICAL ISOLATION
1
/
-in. (6 mm) from
4
NOTES:
1. Optional soleplate package includes 4 soleplates, 16 jacking screws and 16
leveling pads. Isolation package is also required.
2. Jacking screws to be removed after grout has set.
3. Thickness of grout will vary, depending on the amount necessary to level chiller.
Use only pre-mixed non-shrinking grout, Ceilcote
0-1½ (38.1 mm) to 0-2¼ (57 mm) thick.
1. Ceilcote is a registered tradmark of Azko Nobel Coatings International.
2. Embeco is a registered trademark of Construction Research and Technology
GMBH Corp.
Fig. 10 — Accessory Isolation with Soleplate Package
For adequate and long lasting machine support, proper grout
selection and placement is essential. Carrier recommends that
only pre-mixed, epoxy type, non-shrinking grout be used for
machine installation. Follow manufacturer's instructions in ap-
plying grout.
1.
Check machine location prints for required grout
thickness.
2.
Carefully wax jacking screws for easy removal from
grout.
3.
Grout must extend above the base of the soleplate and
there must be no voids in grout beneath the plates.
4.
Allow grout to set and harden, per manufacturer's instruc-
tions, before starting machine.
5.
Remove jacking screws from leveling pads after grout has
hardened.
STANDARD ISOLATION
ISOLATION WITH STANDARD PACKAGE ONLY
NOTE: Isolation package includes
4 Shear-Flex isolation pads.
VIEW A-A
1
748 OR Embeco
19
VIEW B-B
2
636 Plus,