General Information - Trane AquaStream 2 CGWN Series Installation Operation & Maintenance

Indoor liquid chiller with integrated hydraulic module r410a
Table of Contents

Advertisement

CG-SVX06B-GB

General information

Foreword
These instructions are given as
a guide to good practice in the
installation, start-up, operation,
and maintenance by the user,
of Trane CGWN/CCUN chillers.
They do not contain full service
procedures necessary for the
continued successful operation
of this equipment. The services
of a qualified technician should
be employed through the medium
of a maintenance contract with a
reputable service company. Read
this manual thoroughly before unit
start-up.
Units are assembled, pressure
tested, dehydrated, charged and run
tested before shipment.
Warnings and cautions
Warnings and Cautions appear at
appropriate sections throughout
this manual. Your personal safety
and the proper operation of this
machine require that you follow
them carefully. The constructor
assumes no liability for installations
or servicing performed by unqualified
personnel.
WARNING! : Indicates a potentially
hazardous situation which, if not
avoided, could result in death or
serious injury.
CAUTION! : Indicates a potentially
hazardous situation which, if not
avoided, may result in minor or
moderate injury. It may also be used
to alert against unsafe practices or
for equipment or property-damage-
only accidents.
Safety recommendations
To avoid death, injury, equipment
or property damage, the following
recommendations should be
observed during maintenance and
service visits:
1. The maximum allowable
pressures for system leak testing on
low and high pressure side are given
in the chapter "Installation". Always
provide a pressure regulator.
2. Disconnect the main power
supply before any servicing on the
unit.
3. Service work on the refrigeration
system and the electrical system
should be carried out only by
qualified and experienced personnel.
Reception
On arrival, inspect the unit before
signing the delivery note. Specify
any visible damage on the delivery
note, and send a registered letter
of protest to the last carrier of the
goods within 7 days of delivery.
Notify the local TRANE sales office
at the same time. The delivery
note must be clearly signed and
countersigned by the driver.
Any concealed damage shall be
notified by a registered letter of
protest to the last carrier of the
goods within 7 days of delivery.
Notify the local TRANE sales office
at the same time.
Important notice: No shipping claims
will be accepted by TRANE if the
above mentioned procedure is not
respected.
For more information, refer to the
general sales conditions of your local
TRANE sales office.
Note: Unit inspection in France.
Delay to send registered letter
in case of visible and concealed
damage is only 72 hours.
3

Advertisement

Table of Contents
loading

Table of Contents