Trane BAYUVCLK001 Installer's Manual page 8

Ultraviolet (uv-c) lamp kit for 2-5 ton air handlers
Table of Contents

Advertisement

Installing power wiring connections
STEP 11. Rest the ballast assembly on top of the cross brace.
IMPORTANT: Do not cut or remove the cable tie that holds the
ballast assembly power plugs. The tie prevents strain on the
splices.
STEP 12. Connect the ballast assembly in series with the high voltage
leads.
Splices
Do not cut
or remove
Ballast power
plugs
From Coil
Compartment
Disconnect air handler power
junction plugs
8
Ballast assembly
with power plugs
- Unconnected
From Blower
Compartment
Ballast assembly
with power plugs
- Connected
From Coil
Compartment
From Blower
Compartment
18-GJ11D1-2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents