Gas piping

Connecting gas supply piping to
boiler
1. Remove jacket front panel and refer to
to boiler.
a.
at inlet of gas connection to boiler.
Install drip leg
Where local utility requires drip leg to be extended to
the floor, use appropriate length of pipe between cap
and tee.
b.
Install ground joint union
quired.
c.
Install manual shutoff valve
side boiler jacket when required by local codes or utility
requirements.
d.
— When using manual main shutoff valve, it
In Canada
by the installer.
must be identified
2.
with hangers, not by boiler or its accessories.
Support piping
3.
from gas supply piping.
Purge all air
4. Before placing boiler in operation,
.
connection for leaks
a.
Close manual main shutoff valve
testing at less than 13" w.c.
b.
Disconnect boiler and gas valve from gas supply
during any pressure testing greater than 13" w.c.
piping
Do not check for gas leaks with an open
— use bubble test. Failure to use bubble
flame
test or check for gas leaks can cause severe
personal injury, death or substantial property
damage.
5.
Use pipe dope compatible with propane gases.
sparingly only to male threads of pipe joints so that pipe dope
does not block gas flow.
Failure to apply pipe dope
can result in severe personal injury, death or
substantial property damage.
Table 7 Pipe capacity for 0.60 specific gravity natural gas
Capacity of pipe for pipe size of:
Gas pipe
(Capacity in cubic feet gas per hour)
length
(feet)
½"
¾"
10
132
278
20
92
190
30
73
152
40
63
130
50
56
115
75
45
93
100
38
79
150
31
64
30
to pipe gas
Figure 26
for servicing, when re-
in gas supply piping out-
check boiler and its gas
during any pressure
Apply
as detailed above
1"
1¼"
1½"
520
1050
1600
350
730
1100
285
590
860
245
500
760
215
440
670
175
360
545
150
305
460
120
250
380
Boiler Manual
Natural Gas:
1. Refer to
for pipe length and diameter. Base on rated
Table 7
boiler input (divide by 1,000 to obtain cubic feet per hour).
is only for gas with
Table 7
pressure drop through the gas piping of 0.30" w.c.
additional gas pipe sizing information, refer to ANSI Z223.1/
NFPA 54 – latest edition (or B149.1 or B149.2 for Canadian
Natural Gas and Propane Installation Code).
2. Inlet pressure required at gas valve inlet:
Maximum: 13" w.c.
Minimum: 5" w.c.
Manifold gas pressure: 3.5" w.c.
3. Install 100% lockup gas pressure regulator in supply line
inlet pressure exceeds 13" w.c.
mum.
Propane Gas:
1. Contact gas supplier to size pipes, tanks and 100% lockup
gas pressure regulator.
2. Adjust propane supply regulator provided by gas supplier for
13" w.c. maximum pressure.
3. Inlet pressure required at gas valve inlet:
Maximum: 13" w.c.
Minimum: 11" w.c.
Manifold gas pressure: 10" w.c.
Figure 26 Gas supply piping
specific gravity 0.60, with a
Adjust for 13" w.c. maxi-
Part Number 550-142-302/0520
For
if

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgi-4Cgi-5Cgi-25/3Cgi-6Cgi-7Cgi-8 ... Show all

Table of Contents