Installing the shielding

1.3 Installing the shielding
6
Siemens Industry, Inc.
Building Technologies Division
1. When shielded cables are used, mount the two cable glands (3) with the nuts (2)
on the flange between the fastening tabs (1).
2. Plug the network module (SAFEDLINK) (5) into the connector X13 as shown.
3. Fasten the network module to the fastening tabs (1) using the two fixing screws (4).
4. Check that the network module is secured correctly in order to prevent open
circuits.
5. Wire up the system bus SAFEDLINK according to the pin assignment.
If using shielded cables, the cable gland must be fitted.
Installing the shielding
1
Nut
2
Sealing element
3
Contact sleeve
4
Bottom part of cable gland
5
Braid
X
Length of contact sleeve
1. Pull nut (1), sealing element (2) and contact sleeve (3) over cable.
2. Trim outer cable surround to the desired length.
3. Trim braid or shield film to the contact sleeve (X) length.
4. Slide nut (1), sealing element (2) and contact sleeve (3) to end of surround.
5. Place braid or shield film over contact sleeve (3). Cut off protruding material.
6. Guide the prepared cable into fitted bottom part of cable gland (4) until sealing
element (2) and contact sleeve (3) are flush in bottom part.
7. Screw nut (1) to bottom part such that the cable is firmly pressed in.
A6V10315042_f_en_--
2015-04-16