Instructions For Remote Control Assembly; Wired Remote Command Connection - Baxi CBP Matic 18 Manual

Pellet boiler
Table of Contents

Advertisement

Available languages

Available languages

Figure 19 – Wired remote command connection

Instructions for remote control assembly

1 – Turn off the equipment at the main power switch and remove the right-hand side
of the pellet-run boiler.
2 – Remove the unit's terminals phase (F) and neutral (N).
a)
3 – Rivet the terminals of the 220V wire supplying power the transmitter.
40

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbp matic 24Cbp matic 30

Table of Contents