Wiring Diagram - GRAUPNER S-204 Operating Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

Deploy the receiver aerial under the deck support
flange inside the hull, and tape it in place
securely.
IMPORTANT:
reception, the aerial wire must be as high as
possible above the waterline, and should run in a
broad curve round the hull; the GRP hull only has
a very slight adverse effect on radio reception. If
you prefer, you can install a vertical whip aerial
made of thin wire. If you do this, shorten the
flexible aerial attached to the receiver by the
same length as the whip, then solder the two
together.
Place the battery in the model and check the
working systems. You will need to adjust the
position of the drive battery to obtain the correct
trim - the boat should float at the marked
waterline, and must not list (lean to one side).
The battery must be fixed securely, so that it
cannot slip out of position; we recommend Velcro
(hook-and-loop) tape for this. TIP: mark the
position of the corners of the battery using a felt-
tip pen, so that you can replace it in exactly the
same position every time.

Wiring diagram

Motor
Motor
Motor
Maiden run
Charge up all the batteries and check each working system in turn. Ensure that all the loose parts are
secured well. Now you are ready for the boat's maiden run. Keep the speed down initially until you feel
familiar with the model's handling characteristics. Don't allow the boat to get too far away from the bank.
We hope you have many hours of pleasure assembling and running your S-204 model boat.
Replacement parts
Order No. 2008.6
You will also need the following items (not included in the set)
Order No. 4725 mc-12 40 MHz FM RC set
Order No. 2875
Order No. 2490.8
Order No. 2989
Order No. 3389
Order No. 1177
Order No. 3368.1
GRAUPNER GmbH & Co. KG D-73230 KIRCHHEIM/TECK GERMANY
Keine Haftung für Druckfehler. Technische Änderungen vorbehalten! Liability for printing errors excluded. We reserve the right to introduce modifications. Sous réserve de
modifications! Nous ne sommes pas responsables d'éventuelles erreurs d'impression!
to
ensure
reliable
Propeller set
NAVY V40R speed controller
GM Power Pack 3600 NiMH drive battery, 9.6 V / 3600 mAh
G2 connector system for speed controller and battery
2 m flexible copper cable; alternatively you can shorten the cables attached to the motor
and use this material for the connecting leads to the drive battery
Swivel pushrod connector (two required)
Velcro tape
speed controller
G2 plug
to receiver
#0056878
accu
G2 plug
9
09/2006

Advertisement

Table of Contents
loading

This manual is also suitable for:

2008

Table of Contents