Prerequisites for installing the Avaya Virtual Services Platform 4000 in an equipment rack:
• Ensure that you have a space of 1.75 inches (4.45 centimeters) in height for each switch in an
EIA or IEC-standard 19-inch (48.2-centimeter) equipment rack.
• The rack is bolted to the floor and braced if necessary.
• The rack is grounded to the same grounding electrode used by the power service in the area.
The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack
to the grounding electrode.
1. Attach the L-bracket to each side of the switch using a #2 Phillips screwdriver as illustrated
below.
2. Slide the switch into the rack as illustrated.
3. Insert and tighten the rack-mount screws.
July 2015
Installation Job Aid for Avaya VSP 4000 4450GSX series
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vsp 4450gsx seriesVsp 4450gsx-pwr+Vsp 4450gsx-dc

Table of Contents