Install The Beam; Install The Cylinder And Wedge - Champion 100883 Operator's Manual

27 ton
Hide thumbs Also See for 100883:
Table of Contents

Advertisement

100883 - 27 TON LOg SPLiTTER
2. Attach the tow bar to the bracket on top of the hydraulic
oil tank with two M12 × 85 bolts and M12 lock nuts and
washers.

4) install the beam

1. Stand the beam vertical on the foot plate.
2. Roll the tank into position so the pivot holes of the tank and
beam are aligned.
3. Insert the pin and secure it with the R clip.
4. Block the wheels to prevent the frame from rolling.
5. Pivot the beam into the horizontal position and allow the
"Auto-Lock" beam lock mechanism to engage.
The beam is extremely heavy and should only be handled
with 2 or more people. DO NOT try and lift or handle the beam
without assistance.

5) install the Cylinder and Wedge

1. Slide the wedge under the beam rails. Push it toward the foot
plate to make room for the cylinder.
2. Position the cylinder clevis between the mounting plates at
the end of the beam.
3. Align the holes in the cylinder clevis to the holes on the
mounting channels on the beam.
4. Slide the cylinder pin through the mounting channel and
cylinder clevis holes and secure with the two R-clips.
5. Align the holes in the cylinder rod end with the holes in the
wedge.
6. Secure the cylinder rod end to the wedge with the bolt,
washer and lock nut. Tighten, but DO NOT over tighten.
The cylinder rod may need to be rotated slightly in order to
properly align the wedge. Insert a screwdriver into the bolt
hole in the cylinder rod and slowly rotate as needed.
16
ASSEMbLY
WARNiNg
NOTiCE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents