Nvidia DGX A100 Service Manual page 16

System
Hide thumbs Also See for DGX A100:
Table of Contents

Advertisement

5. Install the new power supply.
a). Insert the new power supply into the chassis and push it all the way in, making sure
that the green locking mechanism engages.
b). Plug in the power cord and lock it in place.
c). If needed, power on the system.
6. Confirm the installation by
Viewing the PSU status from the BMC dashboard->
Running
nvsm show health
Pack the old power supply and ship it back to NVIDIA Enterprise Support.
NVIDIA DGX A100 System
Sensors
to confirm all power supplies are healthy.
Power Supply Replacement
page.
DU-10044-001 _v01   |   10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents