Standard - GE Cafe Advantium CSB913 Installation Instructions Manual

Built-in wall oven
Table of Contents

Advertisement

PREPARE THE OPENING
Advantium Built-In Oven can be installed in
combination with other Built-In appliances. Always
follow each product's Installation Instructions to
complete the installation.
Single Advantium Built-In Oven Installation:
Order a 30" wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
30"
17-1/2"
36-3/4"
Min.
• Allow 2-1/4" case trim overlap at the
top and 1" overlap on the bottom and 2-1/4" overlap
for each side of the opening.
• Oven overlaps will conceal cut edges on all sides of
the opening.
When installed over a single oven or a warming
drawer, allow at least 2" between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium 120 and the other
appliance overlaps.
• The support must be level and rigidly mounted, flush
with the bottom edge of the cutout.
31-2000354 Rev.0
Standard Installation Preparation
23-1/2"
25-1/4"
Construct
solid bottom
- Min. 3/8"
plywood
supported
on all four
sides. Must
be able to
support
weight of
oven and
contents.
PREPARE THE OPENING
Installation over a Warming Drawer:
30"
25-1/4"
17-1/2"
36-3/4"
Min.
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location does not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
(CONT.)
23-1/2"
Construct
solid bottom
- Min. 3/8"
plywood
supported
on all four
sides. Must be
able to support
weight of oven
and contents.
2" Min.
(3" Recommended
Per Warming
Drawer
Requirement
)
5

Advertisement

Table of Contents
loading

Table of Contents