Prepare boiler location —
Provide the following clearances:
1. Hot water pipes — at least ½" from combustible
materials.
2. Recommended service clearances — See
3. Minimum clearances for tight spaces — See
Figure 2
Figure 1 Recommended clearances for service
Figure 2 Minimum clearances for tight spaces
Part number 550-110-260/0200
.
clearances
Flooring and foundation
Flooring
The CGs boiler is approved for installation on
.
combustible flooring, but must never be installed on
Figure 1
carpeting.
Foundation
Provide a solid brick or minimum
concrete foundation pad if any of the following is true:
•
floor can become flooded.
•
the boiler mounting area is not level.
The minimum foundation size is
Boiler model number
CGs-3
CGs-4
CGs-5
CGs-6
Residential garage installation
Precautions
Take the following special precautions when installing
the boiler in a residential garage. If the boiler is located
in a residential garage, per ANSI Z223.1, paragraph
5.1.9:
•
Mount the boiler a minimum of
above the floor
burner and ignition devices will be no less
than 18 inches above the floor.
•
Locate or
damaged by a moving vehicle.
Do not install boiler on carpeting
even if foundation is used. Fire can
result, causing severe personal
injury, death or substantial property
damage.
2-inch
long by:
25"
Width — Inches
15
18
21
24
18 inches
of the garage to assure the
so it cannot be
protect the boiler
thick
7