Weil-McLain EG-30 THRU -75 Control Supplement page 9

Gas-fired boilers – series 4
Hide thumbs Also See for EG-30 THRU -75:
Table of Contents

Advertisement

Standing Pilot Boilers — Control Supplement
Control installation
For your safety, turn off electrical power supply and turn off external gas supply valve before attempting to work on the
boiler. Failure to comply can cause severe personal injury, death or substantial property damage.
EG-30 thru -65 and PEG-30 thru -65 steam boilers with probe-type low water cutoff
1. Mount and wire controls per wiring diagram, page
8, and Figure .
a. Attach junction box inside left jacket panel with #8-
x ½" machine screws provided.
b. Install transformer with plug-in relay receptacle.
c. Operating and limit circuit wiring must be 18 gauge
or heavier.
. Bring supply wiring to boiler. Must be 1 gauge or
heavier.
. Proceed to page 1.
EG-75 steam boilers with probe-type low water cutoff
1. Mount and wire controls per wiring diagram, page
8, and Figure .
a. Attach junction box inside left jacket panel with
#8- x ½" machine screws and green ground nuts
provided.
b. Install transformer with plug-in relay receptacle. In
Canada, use chain and hook strain relief.
c. Operating and limit circuit wiring must be 18 gauge
or heavier.
. Bring supply wiring to boiler. Must be 1 gauge or
heavier.
. Proceed to page 1.
Part Number 550-110-032/0607
continued
Figure 4
Figure 5


Advertisement

Table of Contents
loading

This manual is also suitable for:

Peg-30Eg-75Peg-65

Table of Contents