Powering on the switch

Verification before power-on

Before powering on the switch, verify that:
The power cord is properly connected.
The input power voltage meets the requirement of the switch.
The console cable is connected correctly.
The console terminal is powered on and configured correctly.

Power-on sequence

The A5120-24G-PoE+ EI TAA (2 slots) switch is used in the following example.
The power-on sequence is as follows:
Power on the switch. The console terminal screen displays the following information:
1.
Starting......
********************************************************************************
*
(Figure
37), set the emulation to VT100 and click OK.
32
*

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A5120 si seriesA5120-24g eiA5120-48g eiA5120-24g ei taaA5120-48g ei taaA5120-24g-poe+ ei ... Show all

Table of Contents